        關于試油工藝設計的那些詞,都在這里了

        含油氣顯示oil/gas shows

        根據測井解釋according to the well logging interpretation

        泥漿錄井解釋the mud logging interpretation

        物性、產能和地層參數to determine the physical property,productivity and formation parameters

        確定含油氣性能to determine the hydrocarbon-bearing property

        高產工業油氣流high-yield industrial hydrocarbon flow

        根據試油情況確定完井投產方案 determine the well completion and production plan dependingon the well testing result.

        試油地質設計要求according to the geologic design for welltesting

        按標準取全取準各項地質資料數據To acquire full and accurate geologic data

        落實地層參數、產能及流體性質focusing on identifying formation parameters productivity and fluid properties

        資料錄取the acquisition of data

        按Q/SL0798-2000《試油井原始資料錄取要求》標準執行in accordance with Q/SL0798-2000 Requirements for Acquisition of Original Data from Tested Wells.

        ?試油方案Well testing program

        由于火工器材所限Limited by the initiating explosive devices

        設計采用電纜輸送射孔,下MFE地層測試工具it is designed to adopt wireline conveyed perforating. RIH MFE formation test tools for well testing

        進行試油測試及常規抽汲排液、求產conventional swabbing displacement and production

        試油層位較淺As the formation to be tested is relatively shallow

        流動壓差不是太大the flowing pressure differential is not very high

        確定不加測試液墊it is decided not to pump testing liquid cushion

        更有利于取得地層流體物性參數which is in favor of determining the physical property parameters of the formation fluid

        低滲、低產層low permeability and low yield formations

        盡可能采用抽汲等人工排液工藝Try the best to apply artificial displacement process such as swabbing

        增加地層產液量to increase fluid production

        有助于取得準確的地層液性和產能which is in favor of acquiring formation fluid property and productivity accurately

        試油工藝思路THINKING FOR TESTING PROCESSES

        按日費基數計算價格The prices will be calculated based on daily rate

        下井器材由甲方購買the downhole apparatus shall be purchased by Company

        第1層:施工準備→裝井口及防噴器→通井→替泥漿→試壓→刮管、洗井、替防膨液→電纜輸送射孔→下測試儀測試→測試→洗井→起測試管柱。1st Layer: Operation preparation →wellhead and BOP installation→ wiper trip → drilling fluid displacement → pressure test →pipe scraping, well flushing,anti-swelling agent displacement → wireline-conveyed perforating → running testing instrument → testing→ well flushing→ pulling out testing string.

        第2層:打橋塞→填砂→替防膨液→電纜輸送射孔→下測試儀測試→測試→洗井→起測試管柱→沖砂→撈橋塞2nd Layer: pumping bridge plug →sand filling→ anti-swelling agent displacement →wireline-conveyed perforating → running testing instrument → well flushing→ pulling out testing string →sand washing →fishing bridge plug

        第3層:替防膨液→電纜輸送射孔→下螺桿泵→排液、求產→完井3rd Layer: anti-swelling agent displacement→ wireline-conveyed perforating →running screw pump →displacing the fluid and producing→ well completion.